Evidence library · COM-0030
Email trail Update on Shipping FULL (27 Apr-22 May): incl Clayton 18 May spec sheet claim + always-required contract admission
Source date: 22 May 2026 · Email thread print
The shipping email thread preserves Expandify’s claims about the specification sheet, an unpaid septic report and the need for a separate contract for installation.
Full Gmail print of the 'Update on Shipping' thread, 27 April to 22 May 2026, retaining Sarah's statements that the attached specification sheet is 'the correct specification sheet from that time', that the septic contractor's inspector 'had not been paid' for the formal report, and that a QBCC contract 'was always required to cover the on-site installation phase'.
Source limitations
Publication copy with third-party identifying details redacted. The complete original is preserved privately.